Mexico: The Energy Regulatory Commission published the general administrative provisions on electromobility for the integration of charging infrastructure for electric and hybrid vehicles

In force as of 11 september 2024

In brief

On 10 September 2024, the Energy Regulatory Commission (“CRE”) published1 the general administrative provisions on electromobility for the integration of charging infrastructure for electric vehicles (EV), and plug-in hybrid electric vehicles (PHEV) into the National Electric System (“SEN”) as part of a Smart Grid (“Provisions”).

The Provisions regulate (i) the connection of charging infrastructure for EVs and PHEVs to the SEN; and (ii) the development of a digital platform to learn about the evolution of charging infrastructure in Mexico.


Contents

In more detail

The provisions establish the following: (a) The requirements for energy end-users connecting EV and PHEV charging infrastructure to the SEN; (b) The minimum information that end-users and suppliers must provide to integrate the digital platform on the characteristics of the publicly available EV and PHEV charging infrastructure, such as (i) type of connector, (ii) number of chargers available, and (iii) price offered for EV and PHEV charging.

Among the highlighted details of the Provisions, it also establishes the obligation for end-users to request a new electricity supply contract (in accordance with the regulatory framework for supply contracting) independently for the EV and PHEV charging infrastructure, with respect to the contract they already have in place, or intend to contract.

Likewise, if end-users require the installation of clean power plants as a source of energy for charging EVs and PHEVs, they must comply with the regulatory framework for the installation of distributed generation power plants, distributed clean generation, and interconnection of plants with a capacity of less than 0.5 MW.

In addition, charging stations must display on the digital platform the payment method and the prices of electricity for charging EVs and PHEVs, according to: (a) $/kWh; (b) $/h, $/min; (c) $/week, $/month, $/year. Likewise, end-users with EV and PHEV charging infrastructure, depending on their particular business activity (resale of energy, own uses, non-onerous delivery of energy, etc.) must provide certain information related to their particular operations and activities, to the CRE, via the digital platform, for each contracted electricity supply.

The CRE will monitor compliance with the Provisions and may request information from end-users at any time, as well as they may schedule and/or conduct verification visits to supervise compliance with the Network Code. Additionally, the CRE will coordinate with the Federal Economic Competition Commission (COFECE) to monitor market development.

The CRE will develop a digital platform within a period of no more than 24 months; until such digital platform is available, all the information that end-users, suppliers and distributors must submit will be done manually. Until the digital platform is operational, end-users must publish all the required information on their platforms, mobile applications or through digital pages.

* * * * *

Should you wish to discuss this matter in more detail, please do not hesitate to contact us.

Our Firm is at your service for any questions or services regarding this matter.


1 In the Official Gazette of the Federation Agreement Number A/108/2024

 



Copyright © 2024 Baker McKenzie. All rights reserved. Ownership: This site (Site) including all documentation and content (Content) is a Copyright © 2022 Baker & McKenzie. All rights reserved. Ownership: This documentation and content (Content) is a proprietary resource owned exclusively by Baker McKenzie (meaning Baker & McKenzie International and its member firms). The Content is protected under international copyright conventions. Use of this Content does not of itself create a contractual relationship, nor any attorney/client relationship, between Baker McKenzie and any person. Non-reliance and exclusion: All Content is for informational purposes only and may not reflect the most current legal and regulatory developments. All summaries of the laws, regulations and practice are subject to change. The Content is not offered as legal or professional advice for any specific matter. It is not intended to be a substitute for reference to (and compliance with) the detailed provisions of applicable laws, rules, regulations or forms. Legal advice should always be sought before taking any action or refraining from taking any action based on any Content. Baker McKenzie and the editors and the contributing authors do not guarantee the accuracy of the Content and expressly disclaim any and all liability to any person in respect of the consequences of anything done or permitted to be done or omitted to be done wholly or partly in reliance upon the whole or any part of the Content. The Content may contain links to external websites and external websites may link to the Content. Baker McKenzie is not responsible for the content or operation of any such external sites and disclaims all liability, howsoever occurring, in respect of the content or operation of any such external websites. Attorney Advertising: This Content may qualify as “Attorney Advertising” requiring notice in some jurisdictions. To the extent that this Content may qualify as Attorney Advertising, PRIOR RESULTS DO NOT GUARANTEE A SIMILAR OUTCOME. Reproduction: Reproduction of reasonable portions of the Content is permitted provided that (i) such reproductions are made available free of charge and for non-commercial purposes, (ii) such reproductions are properly attributed to Baker McKenzie, (iii) the portion of the Content being reproduced is not altered or made available in a manner that modifies the Content or presents the Content being reproduced in a false light and (iv) notice is made to the disclaimers included on the Content. The permission to re-copy does not allow for incorporation of any substantial portion of the Content in any work or publication, whether in hard copy, electronic or any other form or for commercial purposes.