United Kingdom: The new Energy Security Strategy is launched

In brief

On 7 April 2022 the UK published its Energy Security Strategy. The key aim of the strategy is for the UK to achieve long-term independence from foreign energy sources and decarbonise the nation's power supply. The strategy echoes the communication released on 8 March 2022 by the European Commission in relation to the Joint European Action for more affordable, secure and sustainable energy.

The UK's Energy Security Strategy reinforces the Government's commitment to decarbonisation, with an ambitious new target for offshore wind by 2030 and a doubling of the previous target for hydrogen production in the same time frame. The Government sees oil and gas as an important transition fuel and has set out plans to increase activity in the UK North Sea.


Contents

The strategy sets out the Government's ambitions across the different energy sectors.

Oil and Gas: The strategy states that "net-zero is a smooth transition, not an immediate extinction, for oil and gas". The Government plans to launch a new licensing round for new North Sea oil and gas projects in autumn 2022, with a new task force, the Gas and Oil New Project Regulatory Accelerators, providing support to new developments. The aim is to increase the proportion of domestic gas on the grid, with the government arguing that producing gas in the UK has a lower carbon footprint than imported from abroad. 

Wind: Offshore wind plays a key role in the strategy, with an ambition to deliver up to 50GW by 2030, a tenth of which would come from turbines on floating structures that can be positioned in deeper seas further offshore. The Government has vowed to cut the approvals process from four years to one and set up a fast-track approvals route for priority projects. No new target was set for onshore wind.

Solar: The strategy does not set a firm target for solar power, but the Government has an expectation for it to increase five-fold to 70GW by 2035. 

Nuclear: The strategy sets a target of tripling nuclear output to 24GW by 2050, equating to 25% of Britain's projected electricity demand. The Government intends to take one nuclear project to FID "this Parliament" (i.e., before January 2025 at the latest) and two projects to FID in the "next Parliament" (i.e., before January 2030 at the latest),. Subject to readiness, Small Modular Reactors (SMRs), will be included in this pipeline, subject to value for money and relevant approvals. This is will sit alongside the existing investment in addition to the GBP 100 million to support the development of Sizewell C, and GBP 210 million to bring through Small Modular ReactorsMRs. The Government will set up a new task force, the Great British Nuclear Vehicle, this year to support the development process of new builds.

Hydrogen: In the foreword to the strategy, the UK Prime Minister Boris Johnson refers to hydrogen as "a low carbon super-fuel of the future" and makes a commitment to produce "vastly more" of it than previously announced. The Government has now doubled its ambition to increase hydrogen production, with a new target of 10GW by 2030, with at least half of this being electrolytic hydrogen. Allocation rounds for electrolytic hydrogen will be run, moving to price-competitive allocation by 2025 so that up to 1GW of electrolytic hydrogen is in construction or operational by 2025. By that same time, a hydrogen certification scheme will be set up to facilitate the import and export of high-grade hydrogen, and new business models for hydrogen transport and storage infrastructure will be designed.

Networks: As soon as practicable, the Government will establish the Future System Operator to drive the transition and oversee the UK energy system. An Electricity Networks Commissioner will be appointed to advise Government on policies and regulatory changes. By the end of this year, the Government will set out a blueprint for the whole system in the Holistic Network Design and Centralised Strategic Network Plan.

The Energy Security Strategy is a significant step toward achieving the UK's decarbonisation goals, with increased targets for offshore and nuclear energy in 2030 and 2050 respectively. However, the strategy is light on specifics and makes only vague commitments to the cheapest and fastest forms of new generation, especially onshore wind. The strategy is a long-term plan for Britain, with both the Prime Minister and the Business Secretary conceding that consumers will not see results for at least a few years. Nevertheless, delivering on the commitments it has made will be a substantial challenge, and the Government will have to overcome opposition both from those within the ruling Conservative party who feel it goes too far and critics who feel it does not go far enough.


Copyright © 2024 Baker McKenzie. All rights reserved. Ownership: This site (Site) including all documentation and content (Content) is a Copyright © 2022 Baker & McKenzie. All rights reserved. Ownership: This documentation and content (Content) is a proprietary resource owned exclusively by Baker McKenzie (meaning Baker & McKenzie International and its member firms). The Content is protected under international copyright conventions. Use of this Content does not of itself create a contractual relationship, nor any attorney/client relationship, between Baker McKenzie and any person. Non-reliance and exclusion: All Content is for informational purposes only and may not reflect the most current legal and regulatory developments. All summaries of the laws, regulations and practice are subject to change. The Content is not offered as legal or professional advice for any specific matter. It is not intended to be a substitute for reference to (and compliance with) the detailed provisions of applicable laws, rules, regulations or forms. Legal advice should always be sought before taking any action or refraining from taking any action based on any Content. Baker McKenzie and the editors and the contributing authors do not guarantee the accuracy of the Content and expressly disclaim any and all liability to any person in respect of the consequences of anything done or permitted to be done or omitted to be done wholly or partly in reliance upon the whole or any part of the Content. The Content may contain links to external websites and external websites may link to the Content. Baker McKenzie is not responsible for the content or operation of any such external sites and disclaims all liability, howsoever occurring, in respect of the content or operation of any such external websites. Attorney Advertising: This Content may qualify as “Attorney Advertising” requiring notice in some jurisdictions. To the extent that this Content may qualify as Attorney Advertising, PRIOR RESULTS DO NOT GUARANTEE A SIMILAR OUTCOME. Reproduction: Reproduction of reasonable portions of the Content is permitted provided that (i) such reproductions are made available free of charge and for non-commercial purposes, (ii) such reproductions are properly attributed to Baker McKenzie, (iii) the portion of the Content being reproduced is not altered or made available in a manner that modifies the Content or presents the Content being reproduced in a false light and (iv) notice is made to the disclaimers included on the Content. The permission to re-copy does not allow for incorporation of any substantial portion of the Content in any work or publication, whether in hard copy, electronic or any other form or for commercial purposes.